Useful Information
Frequently Asked Questions
Frequently Asked Questions
INSTALLING TILE
How do I know when my tile installation is ready to receive grout?
Most standard thin-set mortars will reach initial cure within 24 hours, however certain job conditions could affect the final cure time required and you should always refer to and comply with the manufacturers instructions listed on the thin-set bag.
Most standard thin-set mortars will reach initial cure within 24 hours, however certain job conditions could affect the final cure time required and you should always refer to and comply with the manufacturers instructions listed on the thin-set bag.
What is the maximum spacing for floor joists under a tile installation?
On standard wood frame construction, joists should be spaced a maximum of 16" on center
On standard wood frame construction, joists should be spaced a maximum of 16" on center
Can cement board be installed directly to the floor joists?
No, cement backerboard is not a structural member. It must be installed over an exterior plywood subfloor, 5/8" minimum thickness.
No, cement backerboard is not a structural member. It must be installed over an exterior plywood subfloor, 5/8" minimum thickness.







